Built something powerful with Claude Code but struggling to deploy, scale, and maintain it in production? We handle the full path from dev to ship — CI/CD, infrastructure, monitoring, and zero-downtime deploys.
Claude Code is exceptional for building software quickly, but production requires proper CI/CD pipelines, staging environments, database migrations, authentication, monitoring, and infrastructure that doesn't exist in a local development setup.
Learn more in our prototype to production guide.
CI/CD pipelines, staging environments, zero-downtime deploys, database migrations, and rollback procedures so shipping is safe and repeatable.
Auto-scaling cloud infrastructure, secrets management, environment parity between dev/staging/prod, and infrastructure-as-code for reproducibility.
Authentication layer, OWASP compliance, secrets scanning, dependency audits, and monitoring so your app is secure from day one in production.
We bridge the gap between "it works on my machine" and "it runs reliably for thousands of users."
Automated pipelines that test, build, and deploy your Claude Code project safely — including database migrations and environment-specific configs.
Know when something breaks before your users do — with real-time error tracking, performance monitoring, and uptime alerts.
Missing environment variables, implicit dependencies, or local-only file paths that Claude Code didn't need to configure during development.
Deploying directly from dev to production means every change is a gamble. You need staging to catch issues before they reach real users.
Authentication added as an afterthought often has security gaps. Production requires a proper auth layer designed from the infrastructure level up.
Our approach to shipping Claude Code projects:
See how we transformed creative production workflows with AI-powered tools that turn ideas into professional briefs and shot lists.
Your AI Tool to Generate Real Productions — Instantly turn your ideas into creative briefs, shot lists, and visual references.
Stop wrestling with deployment. We handle the full production path so you can focus on building — not firefighting.
Common questions about shipping Claude Code projects to production
We set up CI/CD pipelines, staging environments, production databases with proper migrations, monitoring and alerting, authentication, and zero-downtime deployment so your Claude Code project goes from working locally to running reliably for real users.
Common causes: missing environment variables, hard-coded file paths, missing database migrations, implicit dependencies not in package.json, or tests that depend on local state. We audit and fix all of these as part of production readiness.
Production deployment for a Claude Code project needs: CI/CD pipeline, staging and production environments, proper secrets management, database migration strategy, health checks and monitoring, authentication layer, and a rollback plan. We implement all of these for you.
Most Claude Code projects can reach production in 3-6 weeks. The timeline depends on the complexity of the codebase, database needs, authentication requirements, and how much infrastructure needs to be built from scratch.
Yes. We add error tracking (Sentry or similar), performance monitoring, uptime checks, log aggregation, and alerting so you know immediately when something breaks in production — not from a user complaint.